MIRVAL, MUHAMMAD (2018) Pengendalian Waktu Dan Biaya Pekerjaan Konstruksi Akibat Keterlambatan Kerja(Studi Kasus Pembangunan Gedung Islamic Center Padang Panjang). Sarjana thesis, Universitas Putra Indonesia "YPTK" Padang.
Full text not available from this repository.Item Type: | Thesis (Sarjana) |
---|---|
Subjects: | 0 Research > Teknik > Sipil |
Divisions/ Fakultas/ Prodi: | Fakultas Teknik > Teknik Sipil (S1) |
Depositing User: | Administrator |
Date Deposited: | 16 Apr 2018 06:56 |
Last Modified: | 16 Apr 2018 06:56 |
URI: | http://repository.upiyptk.ac.id/id/eprint/135 |
Actions (login required)
View Item |