SARINI, MIRA (2010) Analisis Ekspektasi Waktu Antar Kerusakan Dan Waktu Perbaikan Mesin Open Top Roller (OTR) Pada Stasiun Kerja Penggulungan [Studi Kasus di PT. Perkebunan Nusantara VI (Persero) Kayu Aro]. Sarjana thesis, Universitas Putra Indonesia "YPTK" Padang.
Full text not available from this repository.| Item Type: | Thesis (Sarjana) |
|---|---|
| Subjects: | 0 Research > Teknik > Industri |
| Divisions/ Fakultas/ Prodi: | Fakultas Teknik > Teknologi Industri (S1) |
| Depositing User: | Administrator |
| Date Deposited: | 21 Apr 2018 01:53 |
| Last Modified: | 21 Apr 2018 01:53 |
| URI: | http://repository.upiyptk.ac.id/id/eprint/891 |
Actions (login required)
![]() |
View Item |
