EVALUASI BEBAN KERJA FISIK DAN MENTAL DENGAN METODE WLA DAN DRAWS DI UKM CAHAYA PERABOT

Zuhri, Firman (2023) EVALUASI BEBAN KERJA FISIK DAN MENTAL DENGAN METODE WLA DAN DRAWS DI UKM CAHAYA PERABOT. Sarjana thesis, Universitas Putra Indonesia "YPTK".

[img]
Preview
Text (ABSTRAK)
SKRIPSI_FIRMAN ZUHRI_18101154250043_ABSTRAK.pdf

Download (6kB) | Preview
[img]
Preview
Text (BAB 1)
SKRIPSI_FIRMAN ZUHRI_18101154250043_BAB 1.pdf

Download (48kB) | Preview
[img]
Preview
Text (DAFTAR PUSTAKA)
SKRIPSI_FIRMAN ZUHRI_18101154250043_Daftar pustaka.pdf

Download (226kB) | Preview
[img] Text (FULL TEXT)
SKRIPSI_FIRMAN ZUHRI_18101154250043_FULL TEXT.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Cahaya Perabot UKM is a business engaged in the production of wardrobe furniture, located on Jl. Aru No. 29 RT 03/RW V Lubuk Begalung-Padang. Cahaya Furniture UKM has problems in the production process, where demand is not fulfilled due to the high level of workload. Based on the problem, the purpose of this study was to determine the physical and mental workload experienced by employees in the production department at Cahaya Furniture UKM using the Work Load Analysis (WLA) method, and the Defense Research Agency Workload Scale (DRAWS) method. Using the Work Load Analysis (WLA) method, it is known that the highest physical workload was obtained by workers in the cutting section with a result of 146.63%, and the lowest workload was in the workers in the carving and refining section with a result of 116.04%. From the calculation results it is known that the workload exceeds 100%, meaning that the workload is too high. Furthermore, using the Defense Research Agency Workload Scale (DRAWS) method, it is known that the results of issuing a total score of workload on the cutting section are 62.7895%, the planing section and painting are 64.6295%, the assembly section is 66.312%, the planing section and smoothing of 61.795%. The results of the workload with an average value of 69.5381%, the Overload category (high perceived burden). Based on the results of spending on work categories, it was found that the highest mental workload was found in the Time Pressure variable with a value of 106.775% (Overload) and the lowest mental workload work category was found in the Central Demand variable with a value of 59.662% (Optimal Load). Keywords : Workload, WLA, DRAWS

Item Type: Thesis (Sarjana)
Subjects: 0 Research > Teknik > Industri
Divisions/ Fakultas/ Prodi: Fakultas Teknik > Teknologi Industri (S1)
Depositing User: Anggi Anggi A.Md
Date Deposited: 13 Jun 2023 03:05
Last Modified: 13 Jun 2023 03:05
URI: http://repository.upiyptk.ac.id/id/eprint/5477

Actions (login required)

View Item View Item